Material Requirements
2.5 cubic yards
Primary Material:
2.5 cubic yards
Waste Allowance:
0.25 cubic yards
Total with Waste:
2.75 cubic yards
Material Breakdown:
Concrete Mix:
2.5 cubic yards
Rebar (optional):
200 linear feet
Wire Mesh:
220 sq ft
Gravel Base:
1.5 cubic yards
Cost Estimation
Material Costs:
Concrete costs vary by region and type. Ready-mix concrete typically costs $100-150 per cubic yard, while bagged concrete costs $3-5 per 80lb bag.
Estimated Costs:
Concrete Mix:
$312.50
Rebar:
$120.00
Wire Mesh:
$66.00
Gravel Base:
$45.00
Total Material Cost:
$543.50
Additional Considerations:
• Labor costs: $3-8 per sq ft
• Tools and equipment rental
• Permits and inspections
• Delivery charges for materials